PDM Pedrógão Grande, Municipal Master Plan of Pedrógão Grande

In Pedrógão Grande, about 5% of the territory is urban land under the current PDM. See what you can build, where, and the rural zones with the most reclassification potential.

PDM changes

Every amendment to municipal master plans, straight from the national registry (SNIT). Pick a district, municipality or parish on the map to scope this list; click a row to see it on the map.

MunicipalityDistrictChangePublicationDate
Loading…

Status of the PDM of Pedrógão Grande

PDM of Pedrógão Grande in force in 2026: Revisão published as AVISO 10650/2015 on 18 September 2015.

Plan in force
Municipal Master Plan of Pedrógão Grande (SNIT instrument no. 2766) Official register
Publication
Revisão, AVISO 10650/2015, 18 September 2015 Diário da República (PDF)
Latest amendment
4ª Alteração, AVISO 19509/2025/2, 4 August 2025 Diário da República (PDF)
Amendments
7 acts published in total, 6 under the plan in force

How to confirm a revision or amendment

A revision or amendment only takes effect when it is published in the Diário da República. Check the PDM page of the Câmara Municipal de Pedrógão Grande, which announces procedures under way, and the SNIT register of the DGT, which lists every published act. The PCGT platform publishes the procedures in progress.

Source: SNIT register (DGT), synchronised on 25 August 2026. Acts published after that date may not appear yet.

Example of a PDM zoning map drawn over an aerial photo: urban perimeter, rural land and protected areas
Example of how a PDM classifies land. The real zoning for this place is on the map above.

Where can you build in Pedrógão Grande?

In Pedrógão Grande, about 5% of the territory is classified as urban land under the current PDM. That is where construction is generally allowed. The rest is rural land, where building is limited to the plan's exceptions. Pedrógão Grande's Municipal Master Plan organises the area into 1748 zones and has been amended 7 times, most recently on 4 August 2025.

For rural plots next to already-urbanised areas, Portugal's Lei dos Solos opened the door to reclassification as urban land. In Pedrógão Grande, explorador.pt identifies 1 zones with this potential. Use the zoning map below to locate your plot and confirm its classification.

Land categories in Pedrógão Grande

The PDM of Pedrógão Grande classifies 12 875 ha: 689 ha of urban land (5%) and 12 186 ha of rural land (95%). Each class is split into categories that set what can be built. The ones with the most area:

ClassCategoryHectaresShare
Solo RústicoEspaço Florestal936073%
Solo RústicoEspaço Natural e Paisagístico11589%
Solo RústicoEspaço Agrícola11189%
Solo UrbanoEspaço Urbano de Baixa Densidade4644%
Solo RústicoAglomerado Rural4504%
Solo UrbanoEspaço de Atividades Económicas103<1%
Solo RústicoEspaço de Ocupação Turística70<1%
Solo UrbanoEspaço de Uso Especial Equipamentos e Infraestruturas51<1%
Other categories (5)101<1%

Shares of the area classified by the PDM, from the CRUS dataset of the DGT. Water bodies and roads the plan leaves unclassified are not counted.

Constraints in Pedrógão Grande: RAN and REN

Besides the land classification, the PDM of Pedrógão Grande is subject to public easements and restrictions. According to the DGT maps, about 5% of the municipality is in the National Agricultural Reserve (RAN) and 19% is in the National Ecological Reserve (REN).

The RAN protects the soils with the highest agricultural capability. Building in RAN requires a favourable opinion from the regional agriculture authority and, as a rule, is only admitted for agricultural uses or works of public interest.

The REN protects sensitive areas such as flood plains, the coastal strip, unstable slopes and aquifer recharge zones. Building in REN is forbidden, except for the uses the law allows, which depend on prior notice to or authorisation from the regional CCDR.

These shares come from the RAN and REN maps published by the DGT and can overlap urban land. Always confirm a specific plot on the PDM constraints map and on the map above.

Reclassification opportunities

1 rural zones here are scored for reclassification potential.

The ranked list, the map layer, the signals behind each score and the AI evaluation are part of Radar.

See Radar

Regulation and official documents

The binding text is the regulation published in the Diário da República. The zoning and constraints maps (planta de ordenamento, planta de condicionantes) are consulted on the municipal geoportal, and the full record of the plan and its amendments is kept by the DGT.

What it costs here
Property prices in Pedrógão Grande

Median price per m², typology breakdown, parish comparison and rental yield.

Other municipalities in Leiria

Frequently asked questions

Where can you build in Pedrógão Grande?
In Pedrógão Grande, building is mostly allowed on urban land, which makes up about 5% of the territory under the current PDM. The rest is rural land with construction limited to the plan's exceptions.
What percentage of Pedrógão Grande is urban land?
About 5% of Pedrógão Grande's territory is classified as urban land under the current Municipal Master Plan.
How do I consult the PDM of Pedrógão Grande?
You can consult Pedrógão Grande's PDM for free on the Câmara Municipal de Pedrógão Grande website, in the official SNIT register kept by the DGT, and in a simplified form on explorador.pt, where you can see the 1748 mapped zones and the zoning map.Câmara Municipal de Pedrógão GrandeOfficial register (SNIT, DGT)
Which PDM of Pedrógão Grande is in force?
The PDM of Pedrógão Grande in force in 2026 is the Revisão published as AVISO 10650/2015 on 18 September 2015. The most recent act in the SNIT register is the 4ª Alteração of 4 August 2025. The regulation is published in the Diário da República.PDM regulation of Pedrógão Grande (Diário da República)
What constraints apply in Pedrógão Grande?
Besides the PDM zoning, about 5% of the municipality of Pedrógão Grande is in the National Agricultural Reserve (RAN) and 19% is in the National Ecological Reserve (REN), where building depends on the opinion of the entities that manage those reserves. Other easements, such as the public water domain, are not in these maps.
Can the PDM of Pedrógão Grande change?
Yes, Pedrógão Grande's PDM has already been amended 7 times, most recently on 4 August 2025, and can be amended or revised again by the municipal council.
Can rural land be reclassified as urban in Pedrógão Grande?
In Pedrógão Grande, rural plots adjacent to urban land can, in certain cases, be reclassified as urban under the Lei dos Solos. explorador.pt identifies 1 zones with this potential in the municipality.

Official sources