PDM Oliveira de Frades, Municipal Master Plan of Oliveira de Frades

In Oliveira de Frades, about 12% of the territory is urban land under the current PDM. See what you can build, where, and the rural zones with the most reclassification potential.

PDM changes

Every amendment to municipal master plans, straight from the national registry (SNIT). Pick a district, municipality or parish on the map to scope this list; click a row to see it on the map.

MunicipalityDistrictChangePublicationDate
Loading…

Status of the PDM of Oliveira de Frades

PDM of Oliveira de Frades in force in 2026: Revisão published as AVISO 8663/2015 on 7 August 2015.

Plan in force
Municipal Master Plan of Oliveira de Frades (SNIT instrument no. 2740) Official register
Publication
Revisão, AVISO 8663/2015, 7 August 2015 Diário da República (PDF)
Latest amendment
5ª Alteração Simplificada, AVISO 18040/2026/2, 20 July 2026 Diário da República (PDF)
Amendments
12 acts published in total, 7 under the plan in force

How to confirm a revision or amendment

A revision or amendment only takes effect when it is published in the Diário da República. Check the PDM page of the Câmara Municipal de Oliveira de Frades, which announces procedures under way, and the SNIT register of the DGT, which lists every published act. The PCGT platform publishes the procedures in progress.

Source: SNIT register (DGT), synchronised on 25 August 2026. Acts published after that date may not appear yet.

Example of a PDM zoning map drawn over an aerial photo: urban perimeter, rural land and protected areas
Example of how a PDM classifies land. The real zoning for this place is on the map above.

Where can you build in Oliveira de Frades?

In Oliveira de Frades, about 12% of the territory is classified as urban land under the current PDM. That is where construction is generally allowed. The rest is rural land, where building is limited to the plan's exceptions. Oliveira de Frades's Municipal Master Plan organises the area into 395 zones and has been amended 12 times, most recently on 20 July 2026.

For rural plots next to already-urbanised areas, Portugal's Lei dos Solos opened the door to reclassification as urban land. Use the zoning map below to locate your plot and confirm its classification.

Land categories in Oliveira de Frades

The PDM of Oliveira de Frades classifies 14 535 ha: 1789 ha of urban land (12%) and 12 745 ha of rural land (88%). Each class is split into categories that set what can be built. The ones with the most area:

ClassCategoryHectaresShare
Solo RústicoEspaço Florestal829357%
Solo RústicoEspaço Agrícola274819%
Solo RústicoEspaço Natural e Paisagístico148510%
Solo UrbanoEspaço Urbano de Baixa Densidade7405%
Solo UrbanoEspaço Habitacional5794%
Solo UrbanoEspaço de Atividades Económicas2992%
Solo UrbanoEspaço Central93<1%
Solo RústicoAglomerado Rural92<1%
Other categories (7)2081%

Shares of the area classified by the PDM, from the CRUS dataset of the DGT. Water bodies and roads the plan leaves unclassified are not counted.

Constraints in Oliveira de Frades: RAN and REN

Besides the land classification, the PDM of Oliveira de Frades is subject to public easements and restrictions. According to the DGT maps, about 7% of the municipality is in the National Agricultural Reserve (RAN) and 25% is in the National Ecological Reserve (REN).

The RAN protects the soils with the highest agricultural capability. Building in RAN requires a favourable opinion from the regional agriculture authority and, as a rule, is only admitted for agricultural uses or works of public interest.

The REN protects sensitive areas such as flood plains, the coastal strip, unstable slopes and aquifer recharge zones. Building in REN is forbidden, except for the uses the law allows, which depend on prior notice to or authorisation from the regional CCDR.

These shares come from the RAN and REN maps published by the DGT and can overlap urban land. Always confirm a specific plot on the PDM constraints map and on the map above.

Regulation and official documents

The binding text is the regulation published in the Diário da República. The zoning and constraints maps (planta de ordenamento, planta de condicionantes) are consulted on the municipal geoportal, and the full record of the plan and its amendments is kept by the DGT.

What it costs here
Property prices in Oliveira de Frades

Median price per m², typology breakdown, parish comparison and rental yield.

Other municipalities in Viseu

Frequently asked questions

Where can you build in Oliveira de Frades?
In Oliveira de Frades, building is mostly allowed on urban land, which makes up about 12% of the territory under the current PDM. The rest is rural land with construction limited to the plan's exceptions.
What percentage of Oliveira de Frades is urban land?
About 12% of Oliveira de Frades's territory is classified as urban land under the current Municipal Master Plan.
How do I consult the PDM of Oliveira de Frades?
You can consult Oliveira de Frades's PDM for free on the Câmara Municipal de Oliveira de Frades website, in the official SNIT register kept by the DGT, and in a simplified form on explorador.pt, where you can see the 395 mapped zones and the zoning map.Câmara Municipal de Oliveira de FradesOfficial register (SNIT, DGT)
Which PDM of Oliveira de Frades is in force?
The PDM of Oliveira de Frades in force in 2026 is the Revisão published as AVISO 8663/2015 on 7 August 2015. The most recent act in the SNIT register is the 5ª Alteração Simplificada of 20 July 2026. The regulation is published in the Diário da República.PDM regulation of Oliveira de Frades (Diário da República)
What constraints apply in Oliveira de Frades?
Besides the PDM zoning, about 7% of the municipality of Oliveira de Frades is in the National Agricultural Reserve (RAN) and 25% is in the National Ecological Reserve (REN), where building depends on the opinion of the entities that manage those reserves. Other easements, such as the public water domain, are not in these maps.
Can the PDM of Oliveira de Frades change?
Yes, Oliveira de Frades's PDM has already been amended 12 times, most recently on 20 July 2026, and can be amended or revised again by the municipal council.

Official sources